Window, door and siding rules in California

What the state says about window, door and siding work, with the page each rule comes from. It's a summary of the published rules, not legal advice, and your city or county can have rules of its own, especially on permits.

Updated October 9, 2026

On this page: 6 sections
  1. 1Who licenses window, door and siding work
  2. 2Permits to replace windows and doors
  3. 3Permits for new siding
  4. 4Energy code rules for replacement windows
  5. 5Lead-safe work in homes built before 1978
  6. 6Bedroom escape windows

Who licenses window, door and siding work

Window, door and siding contractors in California need a license from the Contractors State License Board, such as C-17 Glazing, a C-61 limited specialty like D-41 Siding and Decking, or a B General Building license. Only jobs under $1,000 that don't need a building permit are exempt (Bus. & Prof. Code 7048).1-4 California's classes for this work also include C-2 Insulation and Acoustical and the C-61 limited specialties D-28 Doors, Gates and Activating Devices and D-65 Weatherization and Energy Conservation.5-7 Check a license with the Contractors State License Board.

Permits to replace windows and doors

California's residential code doesn't list window or door replacement among the jobs exempt from a permit (CRC R105.2), and replacement windows must meet the state energy code. Your city or county building department issues the permit.8-9

Permits for new siding

California's residential code doesn't list re-siding among the jobs exempt from a permit (CRC R105.2). Your city or county building department issues the permit.8

Energy code rules for replacement windows

California's Energy Code requires replacement windows to meet the U-factor and SHGC requirements for new homes (Title 24, Part 6, section 150.2(b)1B); a job replacing 75 square feet of windows or less can instead use windows with a U-factor of 0.40 or lower and, in climate zones 2, 4 and 6 to 15, an SHGC of 0.35 or lower.9

Lead-safe work in homes built before 1978

In a home built before 1978, a contractor paid to replace windows must be an EPA-certified firm (or certified in a state-run program), with a certified renovator directing the work and lead-safe work practices, cleaning and cleaning verification (40 CFR 745.81, 745.85, 745.89). Window replacement never counts as exempt minor repair and maintenance, however small the painted area (40 CFR 745.83), and the firm must give you EPA's Renovate Right pamphlet no more than 60 days before work starts (40 CFR 745.84). EPA runs the program in California.10-11

Bedroom escape windows

California's 2025 residential code uses the 2024 IRC rule: a replacement bedroom window doesn't have to meet the current escape-opening size and sill-height rules if it's the largest standard size that fits the existing opening and opens the same way or wider (R319.5).8

Request a quoteSearch by ZIPContractors near you